Position: Specialist – UG HV Electrical
Contract type & Duration: Specified time contract
Department: Engineering
Reporting to: Superintendent 2 – UG HME Maintenance
Number of Positions: One (1)
Location: Tanzania
post-views-counter domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /www/wwwroot/net.wazaelimu.com/wp-includes/functions.php on line 6131Position: Specialist – UG HV Electrical
Contract type & Duration: Specified time contract
Department: Engineering
Reporting to: Superintendent 2 – UG HME Maintenance
Number of Positions: One (1)
Leave a Comment