Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the post-views-counter domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /www/wwwroot/net.wazaelimu.com/wp-includes/functions.php on line 6131
Nafasi Mpya za Kazi GGM March 2025

Nafasi Mpya za Kazi GGM March 2025

Geita Gold Mining Ltd (GGML) is Tanzania’s leading gold producer with a single operation in Geita Region. The company is a subsidiary of AngloGold Ashanti, an international gold producer headquartered in Denver, USA. AngloGold Ashanti (AGA) has operations in more than ten countries across four continents. Geita Gold Mining Limited (GGML) is situated in the Lake Victoria Gold fields of Northwestern Tanzania, only about 120 km’s from Mwanza City and 20 km’s Southeast of the nearest point of Lake Victoria. The company has its main office and operations in Geita, only 5 Km’s west of the fast-growing town of Geita, and a supporting office in Dar es Salaam. Applications are invited from ambitious, energetic and performance driven individuals to fill in vacant position(s) mentioned below:

Position: Engineer 2 – Open Pit Mine Planning

QUALIFICATIONS:

Degree in Mining Engineering, with relevant professional certification or licenses.

EXPERIENCE:

Minimum of 3 years of experience in Open Pit Mine Planning.
Experience in short to medium-term Open Pit Mine Planning.
Proficiency in Vulcan, Datamine Studio OP, Micromine Spry, Rapid Reserver, Microsoft Office Suite, and other 3D modeling and mine design tools.

ADDITIONAL REQUIREMENTS:

Highly motivated, self-driven, and an excellent team player.
Strong analytical thinking skills.
Demonstrates an unwavering commitment to safety.

Post Start Date: Mar 28, 2025

APPLICATION DEADLINE:04th April 2025 at 5:30 PM

CLICK HAPA KUAPPLY

Leave a Comment